For the Prioritization 7.0 process, the Kerr-Tar RPO will be allowed to submit up to 21 projects in each mode of transportation including aviation, bicycle/pedestrian, highway, rail, and transit. These projects will be evaluated for the 2026-2035 STIP. The draft list was presented to the TCC at their July 20, 2023 meeting. Information on projects currently being considered for submittal in P7.0 is available HERE. The Kerr-Tar TCC and TAC will consider the adoption of a final list at their August 24, 2023 meeting, which will include a formal public hearing at 3:00pm.